Hoisting Frame and Platform Design

When this service Required:

This service is required:

  • Hoisting frames are needed for lifting materials or equipment on site
  • Tower cranes, mobile cranes, or lifting equipment require temporary support frames
  • Lifting operations involve heavy or irregular loads
  • Authority approval or Professional Engineer (PE) endorsement is required for lifting works

Scope of Works:

Our scope of works includes, but is not limited to:

  • Review of lifting requirements and site constraints
  • Structural design and analysis of hoisting frames
  • Load assessment, including lifting, impact, and safety factors
  • Preparation of design calculations and detailed drawings
  • Coordination with lifting specialists, contractors, and equipment suppliers
  • Submission to relevant authorities or PE endorsement (if required)

Deliverables

  • Hoisting frame design drawings
  • Structural design calculations
  • Lifting layout and load assessment details
  • Authority submission or PE endorsement documents (if applicable)

Information Required from Client:

To proceed, the following information is typically required:

  • Project details and site location
  • Lifting purpose and operation sequence
  • Maximum lifting loads and equipment details
  • Proposed hoisting frame location and support conditions
  • Construction programme and timeline

Typical Timeline:

  • Design development and documentation: 1–2 weeks
  • Review and approval: subject to project complexity and authority requirements
  • Implementation support: as per construction schedule

Our works

If you need the above mentioned service, please feel free to contact us for a non-obligation discussion and quote

Reach out to us via WhatsApp or Email now!

Or send us a quick enquiry below!

=