Conversion of temporary structure to permanent building

A definition of a temporary building is any building that is not more than 2 storey and to be used not more than a period of 36 months.

Examples of temporary building is any building used as workers’ quarters, a site office, a show-flat or show-house, a builder’s shed, store or other shed required in connection with any building works for a permanent building.

Outdoor sign and advertisements together with the supporting structures are also considered as temporary structures and must be submitted to BCA. A temporary building permit is also required before any temporary building can be constructed.

The temporary building application has a 2 stage process.

First Stage – Preliminary Approval

We will have to make permit application and submit building plans for approval. Upon approval of the plans and permit, the temporary building can be constructed.

Second Stage – Permit to Use After the temporary building has been constructed, the Professional Engineer’s Certificate of Supervision has to be submitted (Form BCA-CSC-CTSTBW). The Electrical Professional Engineer has to submit Certificate of Supervision in rspect to the lightning protection system (Form BCA_CSC_CSPLP)

When this service Required:

This service is required:

  • Temporary structures (e.g., temporary office buildings, sheds, canopies) are proposed to be converted
    into permanent buildings
  • A change in use or long-term occupation is planned
  • Structural upgrades or strengthening works are needed to meet permanent building standards
  • Regulatory approval is required before conversion and continued occupation

Scope of Works:

Our scope of works includes, but is not limited to:

  • Site assessment and structural condition evaluation
  • Review of existing structural drawings and construction details
  • Structural analysis and design of necessary strengthening works
  • Preparation of design drawings and technical reports
  • Coordination with relevant authorities and consultants
  • Submission of applications for regulatory approval

Deliverables

  • Structural assessment report
  • Design drawings and calculations
  • Technical submission documents
  • Regulatory approval and clearance letters (subject to authority approval) (Overall CSC)
  • Handover documentation and compliance records

Information Required from Client:

To proceed, the following information is typically required:

  • Existing structural drawings and as-built records (if available)
  • Details of the temporary structure (materials, foundation type, construction method)
  • Intended permanent use and occupancy
  • Site location and constraints
  • Proposed modifications or strengthening works
  • Construction timeline

Typical Timeline:

  • Initial assessment and data review: 1–2 weeks
  • Structural design and documentation: 2–4 weeks
  • Regulatory submission and approval: subject to authority processing time