A definition of a temporary building is any building that is not more than 2 storey and to be used not more than a period of 36 months.
Examples of temporary building is any building used as workers’ quarters, a site office, a show-flat or show-house, a builder’s shed, store or other shed required in connection with any building works for a permanent building.
Outdoor sign and advertisements together with the supporting structures are also considered as temporary structures and must be submitted to BCA. A temporary building permit is also required before any temporary building can be constructed.
The temporary building application has a 2 stage process.
First Stage – Preliminary Approval
We will have to make permit application and submit building plans for approval. Upon approval of the plans and permit, the temporary building can be constructed.
Second Stage – Permit to Use After the temporary building has been constructed, the Professional Engineer’s Certificate of Supervision has to be submitted (Form BCA-CSC-CTSTBW). The Electrical Professional Engineer has to submit Certificate of Supervision in rspect to the lightning protection system (Form BCA_CSC_CSPLP)
This service is required:
- Temporary structures (e.g., temporary office buildings, sheds, canopies) are proposed to be converted
into permanent buildings - A change in use or long-term occupation is planned
- Structural upgrades or strengthening works are needed to meet permanent building standards
- Regulatory approval is required before conversion and continued occupation
Our scope of works includes, but is not limited to:
- Site assessment and structural condition evaluation
- Review of existing structural drawings and construction details
- Structural analysis and design of necessary strengthening works
- Preparation of design drawings and technical reports
- Coordination with relevant authorities and consultants
- Submission of applications for regulatory approval
- Structural assessment report
- Design drawings and calculations
- Technical submission documents
- Regulatory approval and clearance letters (subject to authority approval) (Overall CSC)
- Handover documentation and compliance records
To proceed, the following information is typically required:
- Existing structural drawings and as-built records (if available)
- Details of the temporary structure (materials, foundation type, construction method)
- Intended permanent use and occupancy
- Site location and constraints
- Proposed modifications or strengthening works
- Construction timeline
- Initial assessment and data review: 1–2 weeks
- Structural design and documentation: 2–4 weeks
- Regulatory submission and approval: subject to authority processing time