Building Plan Submission

When this service Required:

This service is required:

  • A new building is proposed.
  • Additions & Alterations (A&A) works are planned.
  • Change of use of a building is proposed.
  • Regularization of existing works is required.
  • Authority approval is required prior to construction commencement

Scope of Works:

Our scope of works includes, but is not limited to:

  • Review of project brief and statutory requirements.
  • Site review and assessment of existing drawings (if applicable).
  • Preparation of architectural drawings for submission.
  • Coordination with structural, MEP, fire safety, and other relevant consultants.
  • Code compliance review based on applicable building regulations.
  • Preparation and completion of statutory submission forms.
  • Online submission to relevant authority.
  • Liaison with authority officers during plan review.
  • Addressing authority comments and preparing revised drawings.
  • Resubmission until approval is obtained.
  • Obtaining Building Plan Approval / Written Permission.

Deliverables

  • Complete set of Building Plan submission drawings (PDF and/or hardcopy as required).
  • Submission forms and supporting documents.\
  • Records of submission and authority correspondence.
  • Approved plans / Written Permission from authority (upon approval).

Information Required from Client:

To proceed, the following information is typically required:

  • Copy of land title / ownership documents.
  • Latest survey plan and site information.
  • Existing approved drawings (if applicable).
  • Client’s project brief and space requirements.
  • Proposed construction budget (if available).
  • Appointment of other required consultants (if not under our scope).
  • Any previous authority correspondence related to the project.

Typical Timeline:

  • Preparation of submission drawings: 3–6 weeks
  • Authority review period: 4–12 weeks (depending on authority)
  • Response to comments & resubmission: 2–4 weeks per cycle

Total estimated duration: Approximately 2–5 months until approval.

If you need the above mentioned service, please feel free to contact us for a non-obligation discussion and quote

Reach out to us via WhatsApp or Email now!

Or send us a quick enquiry below!

=